News

Turkey - GC-MS/MS method implementation

In June 2009 KAIN coordinated the installation of GC-MS/MS equipment at the same laboratory in Turkey where UPLC-MS/MS equipment had previously been installed. In the course of a two week visit in the same month, the progress of both projects was monitored and a dedicated method developed. Weiterlesen »



First LOGO

Tags:

After much debate and numerous versions, the first company logo was deployed on 5 June 2009. This logo depicted a symbolic combination of an Indian dream catcher and a magnifying glass, although this is scarcely apparent from its final form. The underlying idea was that innovations often arise from a combination of imagination and analytical insight. The logo was soon found not to meet professional standards however, and it has since been replaced. Weiterlesen »



Mali – Monitoring the quality of natural water sources

A project proposal (content and price) was drawn up for a large, independent consultancy firm which operates worldwide, in relation to monitoring the quality of natural water samples from Mali. The proposal was accepted and the project executed by a qualified laboratory in the Netherlands. The client was satisfied with the results.



Inhalt abgleichen